While we've concluded our high-line operation, we still have more gravel to move off the road's edge. We will be using the power carrier and wheelbarrows to move this gravel in on the Upper La-Z-Boy trail and Lower Surfer's Way trail. Simultaneously, we'll be working on a new bridge, which will be built mid-trail on La-Z-Boy. A group of high school students will be working independently on trash pick-up. They will focus on the lookouts and along the sides of the park access road to keep Little Mountain Park looking beautiful.